What We Do Our Process Portfolio Get Started
← The Journal
Financing Your Outdoor Living Project with LightStream by Truist
The Journal  ·  Field Notes

Financing Your Outdoor Living Project with LightStream by Truist

Kansas City Hardscapes3 min read

When planning a hardscape or outdoor living project, most homeowners focus on design, materials, and timing. One part of the process that often gets overlooked until later is how the project will be paid for. At Kansas City Hardscapes, we want that piece to be just as straightforward as the rest of the experience.

When planning a hardscape or outdoor living project, most homeowners focus on the parts they can picture: the design, the materials, the timing. One piece of the process that tends to get pushed to the back of the conversation is how the project will actually be paid for. At Kansas City Hardscapes we think that part deserves to be just as clear and straightforward as everything else we do.

That is why we partner with LightStream by Truist as our preferred financing option. It is a way for homeowners to build the full scope of what they want, on the timeline they want, without forcing the project into phases that drag out over years.

No. 02 / 06

Why Financing Can Make Sense for Hardscape Projects

Planning a hardscape budget
Planning a hardscape budget.

Hardscape projects are long term investments. Patios, retaining walls, outdoor kitchens, and covered structures are designed to last for decades, not for a couple of seasons. They are closer in lifespan to a roof or a foundation than to a piece of patio furniture, and most homeowners think of them that way once they see the work going in.

Financing exists for the same reason it exists in the rest of the home improvement world. It lets homeowners move forward with the complete scope of a project rather than cutting corners on materials, scaling back the design, or delaying the work for years while a savings account catches up. None of those compromises tend to feel good a few years in.

The clients who choose financing usually do it for one of three reasons. They want to build the full project at once instead of phasing it across multiple seasons. They want to keep cash available for other priorities. Or they want to lock in today’s pricing rather than absorb material and labor cost increases by waiting. Often it is some combination of all three.

No. 03 / 06

Why We Chose LightStream by Truist

Not every financing option fits an outdoor living project. A lot of them either require putting your house on the line, bury you in fees, or quietly inflate the project cost to cover their own kickbacks. We did not want our clients moving through any of that. We wanted financing to feel like the rest of the experience: simple, transparent, and professional.

LightStream is the option we landed on for a few practical reasons. The loans are unsecured, which means they do not require home equity or a lien against the property. Interest rates are competitive for qualified borrowers, and the loan amounts are flexible enough to cover a small phase or a full backyard build. The application is online and straightforward. There are no fees and no penalties for paying it off early.

For most homeowners that adds up to a clean, predictable financing experience without tying the project to the house. The math is the math, and you can plan around it.

No. 04 / 06

How Financing Works with Kansas City Hardscapes

Reviewing a project plan
Reviewing a project plan.

Using LightStream financing does not change how your project is designed or built. We follow the same process for every client, financed or not. We start with a conversation about your goals, your property, and your budget. From there we put together a clear written proposal that lays out scope, materials, and timeline. If financing is part of the plan, you apply directly through LightStream. The loan is between you and them, not us. Once approved, the project moves forward on the schedule we agreed to.

There is also no pressure to finance. Plenty of our clients pay cash. Plenty use financing for the whole project. Plenty do a mix, paying upfront for one phase and financing the rest. Our job is to give you the options and the numbers, then let you decide what makes sense for your situation. The only thing we care about on our end is that whichever path you take, the work itself is done right.

No. 05 / 06

A Smarter Way to Build What You Actually Want

One of the most common things we hear is, “We’d love to do it all now, but we might have to scale back.” Financing often removes that compromise. Instead of settling for a smaller patio or skipping features like seating walls, lighting, or a pergola, many homeowners are able to build the outdoor space they actually envisioned from the start.

No. 06 / 06

Learn More About Financing Your Project

A backyard at twilight with landscape lighting
A backyard at twilight with landscape lighting.

If you’re considering an outdoor living project and want to explore financing, LightStream by Truist is a solid option worth looking into. During your consultation, we’re happy to explain how financing fits into the overall project timeline and answer any questions you may have.

Building an outdoor space should feel exciting, not stressful. Having flexible financing options is one more way we help make the process smooth from start to finish.

Free on-site consultation

Thinking about a project?

Forty-five minutes on site with our designer is all it takes to see what is possible. No pressure, no hard sell.

Schedule a Design Call